Information drawing click Here Fitting Instructions click Here
Fitting Instructions Here
for VBG 795V/795V-2/590V incl. 09-065400, 05-063400 and 09-066200 Fitting Instructions Here
This is the VBG 50mm manually operated coupling fitted with the new IMPROVED version 3 mechanism. Information drawing Here Installation Instructions Here Approval Certificate Here Electrical infrastructure approval Here
Clamp bracket for installing together with VBG's underrun protection endplates EUS-4, EUT, EUL, EUH-3, EUM-3, EUS-MFC and VBG Drawbeam CMS 63V EU. Supplied complete with 4 U-bolts, 2 clamp brackets and 8 nuts. Information drawing Here Fitting Instructions Here Approval Certificate Here
VBG Tube Beam UCSP-2 Steel Protection Beam Tubular Steel Underrun Bar 2314 Long 110mm Dia WITH red conspicuity tape.
Fits - 750/795V, 795V-2, 795VR-2, 795V-3, 795VR-3 Fitting Instructions Here
Sales
Service
Installation